Stimulus Watch-Duluth projects total $413,263,980

I’m hoping the crater-sized pot hole that nearly swallowed my car on a recent trip to Kohls (Sundby Road) falls under MSA street reconditioning. I realize the Lift Bridge takes a lot of paint, but $5,000,000 worth? That’s crazy talk. https://www.stimuluswatch.org/project/by_city/Duluth/MN

1 Comment

  1. frank nichols on June 19, 2009 at 1:47 am

    no wind manufacting. you should’nt go there

Leave a Comment





The maximum upload file size: 1 MB. You can upload: image, audio. Links to YouTube, Facebook, Twitter and other services inserted in the comment text will be automatically embedded. Drop file here