Stimulus Watch-Duluth projects total $413,263,980

I’m hoping the crater-sized pot hole that nearly swallowed my car on a recent trip to Kohls (Sundby Road) falls under MSA street reconditioning. I realize the Lift Bridge takes a lot of paint, but $5,000,000 worth? That’s crazy talk. https://www.stimuluswatch.org/project/by_city/Duluth/MN

Leave a Comment





The maximum upload file size: 128 MB. You can upload: image, audio, video, document, spreadsheet, interactive, text, archive, code, other. Links to YouTube, Facebook, Twitter and other services inserted in the comment text will be automatically embedded. Drop file here